MARINE CABLE RUNDE, NORWAY

 In May 2017 BlueOrbis was in charge of installing the marine cable from Waves4Power wave power plant to shore. The cable is approx. 3 km long. This marine cable is custom designed for the application by nkt cables. The marine operation was managed by BlueOrbis from Olympic Shipping Zeus.Naturally the BlueOrbis team had it's own Polarcirkel work boats on site.